When we do a project we do a project. This is our bathroom. The walls and ceiling had 2 sheets of sheet rock on them. We got the walls all taken down without too much trouble. Some really nice 2 wire outlets that were still in operation. Kind of scary when one of the outlets was behind the vanity and the other was behind the sheet rock behind the toilet. Not sure why you need an outlet behind your toilet but maybe to save time and dry your hair while sitting on the pot. Anyway so we have left the shower and toilet in operation until we have most of the demo done. I wasn't to hip on have just one bathroom in the house especially at 2:00 in the morning when nature calls and the only one is down all the stairs. Plus it is cold down stairs.

So Jason the handyman is scaring the clients or maybe just William but do you blame him. Today Mr. Handy wanted to get the ceiling down. Well, as he starts her finds 2 layers of sheet rock there as well. On layer comes down beautifully but the other layer is covered in that amazing popcorn looking stucco. As Mr. Handy starts to pull down the ceiling the fun, popcorn style, foam insulation comes down with it. As you will take note in the picture below that pile of stuff is the insulation from the ceiling. Note: that is the only insulation in the house. We have none in the walls heading out to the outside. We just found this out and boy is it a bit chilly in there. Mr. Handy can fix that as well.

Mr. Handy just asked for Mike Rowe to come and help. Dirty Job? Whatever! You gotta love Mr. Handy. From the looks of things this project will be going on for a while. Anyone who feels like they don't get dirty enough give us a call.